Project Name:  Morvilius Opera House
Project Type:  Renovation & Addition
Location:  Fort Recovery, Ohio Year Completed: 2026

Built in 1883, the Fort Recovery Morvilius Opera House is located on the second floor of a beautiful historic building located at 101 North Wayne Street in the village of Fort Recovery, Ohio. Freytag and Associates, Inc. was selected to complete a Master Plan for a restoration and addition to the historic building including:

  • Addition for restrooms, stairs, elevator, kitchenette and storage

  • Coordinate with historic artwork in the theater space

  • Renovation of the first-floor retail spaces and basement mechanical and storage areas

  • Structural review

  • Building Code requirements

  • New main entry, access, and vertical circulation

  • HVAC and electrical replacement integrated with the theater aesthetics

  • Illustrative renderings and modeling of the proposed restoration

It was determined that the project required multiple phases for the addition and restoration. Freytag & Associates, Inc. worked closely with the design committee to facilitate and coordinate multiple activities concurrently including: the renovation of the historic building, roof and window replacement, brick tuckpointing, on-going minor renovations, specific requirements for grant funding, and the building addition.