Project Name: Morvilius Opera House
Project Type: Renovation & Addition
Location: Fort Recovery, Ohio Year Completed: 2026
Built in 1883, the Fort Recovery Morvilius Opera House is located on the second floor of a beautiful historic building located at 101 North Wayne Street in the village of Fort Recovery, Ohio. Freytag and Associates, Inc. was selected to complete a Master Plan for a restoration and addition to the historic building including:
Addition for restrooms, stairs, elevator, kitchenette and storage
Coordinate with historic artwork in the theater space
Renovation of the first-floor retail spaces and basement mechanical and storage areas
Structural review
Building Code requirements
New main entry, access, and vertical circulation
HVAC and electrical replacement integrated with the theater aesthetics
Illustrative renderings and modeling of the proposed restoration
It was determined that the project required multiple phases for the addition and restoration. Freytag & Associates, Inc. worked closely with the design committee to facilitate and coordinate multiple activities concurrently including: the renovation of the historic building, roof and window replacement, brick tuckpointing, on-going minor renovations, specific requirements for grant funding, and the building addition.
